Tenders
The Tenders area is where work is estimated and priced before it becomes a live job. A tender moves through a simple lifecycle, and winning it automatically creates the job — carrying your pricing and drawings across so nothing is re-keyed.
The lifecycle
Draft → Submitted → Won / Lost
Use the Update status button on a tender to move it along:
- Mark as Submitted — you've sent your price to the client.
- Mark as Won — creates the live job (see below).
- Mark as Lost — closes the tender off.
Statuses move forwards only. If a tender is marked Won or Lost by mistake, an administrator can correct it.
Creating a tender
- Go to Tenders → New tender.
- A tender reference (e.g.
TND-2026-AB12C) is generated for you. - Pick the Client and Project — you can create either inline without leaving the form.
- Set the Estimator, Project Manager, submission deadline and estimated net value.
- Record any exclusions / clarifications in the notes.
- Upload drawings to the Document Vault (PDF, JPG or PNG, up to 20 files).
The tender list highlights returns that are overdue or due within 48 hours, so nothing slips past its deadline.
Pricing the Bill of Quantities
Each tender has a Bill of Quantities (BoQ) worked across three steps:
- Build — set up sections and line items.
- Price — apply unit rates and build-ups.
- Packages — group items into trade packages for subcontractor enquiries.
Use Adjudication to add prelims, overheads, profit and discounts and turn your net cost into a tender price. The full maths is in the Bill of Quantities and Adjudication & Trade Packages guides.
Take-off from drawings
Open any drawing in the Documents area to measure quantities directly off it — lengths, areas and counts — then link those measurements to BoQ line items so the quantities flow straight into your pricing. See the Take-off & Markup guide for calibration and how each measurement is calculated.
Clarifications
Track tender queries (questions to the client and their answers) as clarifications, with a status of pending, answered or incorporated.
Winning a tender
When you Mark as Won, Bidix creates the live job and carries over:
- the priced Bill of Quantities,
- all drawings and their scale calibration, and
- every take-off markup, still linked to the right BoQ items.
If your plan's live-job limit has been reached, you'll be prompted to upgrade before the job is created.
Tip: Get the BoQ and take-off right at tender stage — it all becomes the baseline for the job, its valuations and the final account.